Project summary for US 1 Corridor Study in Wake Forest, North Carolina.
Project summary for US 1 Corridor Study in Wake Forest, North Carolina.
Project summary for Signal Safety Improvements for NCDOT Division 3 in New Hanover County, North Carolina.
I-440 Design-Build ITS Design Exult Engineering led the Intelligent Transportation System Design as part of the Lane Construction and HDR Design-Build team for I-440 in Division 5. Exult’s role on the project was to design fiber optic interconnect and ITS Devices along I-440 in Raleigh, NC from Walnut Street to Lake Boone Trail and along… Continue reading I-440 Design-Build ITS Design | Raleigh, NC
US 74 Signal Timing Exult is partnered with the NCDOT SSTO Section to retime eight signalized intersections along a 2.2 mile stretch of US 74/NC 200 (Roosevelt Blvd) in Monroe, NC. The Exult team worked with the SSTO and Division 10 traffic engineering staff to determine NCDOT’s vehicular priorities for the corridor before developing and… Continue reading US 74 Signal Timing | Monroe, NC
US 321 Signal Timing Exult worked with the NCDOT Signal System and Timing Operations Section (SSTO) section to add coordinated timing plans to four signalized intersections along a 1.4 Mile stretch of US 321 in Blowing Rock, NC. Our project team worked with the SSTO Section and Division 11 traffic engineering staff to determine NCDOT’s… Continue reading US 321 Signal Timing | Blowing Rock, NC