Project summary for Higgins Greenway Phase IV in Cary, North Carolina.
Project summary for Higgins Greenway Phase IV in Cary, North Carolina.
Project summary for Crabtree Creek Greenway in Cary, North Carolina.
Project summary for High House Bond Park.
City of Durham Transit Fleet & ITS Technology Support City of Durham Transit Fleet & ITS Technology Support Exult Engineering is currently assisting the City of Durham and GoDurham in the revitalization and expansion of their transit fleet by providing various transit related professional services. Transit & ITS Strategic Planning – Exult is preparing a… Continue reading City of Durham Transit Fleet & ITS Technology Support | Durham, NC
I-440 Design-Build ITS Design Exult Engineering led the Intelligent Transportation System Design as part of the Lane Construction and HDR Design-Build team for I-440 in Division 5. Exult’s role on the project was to design fiber optic interconnect and ITS Devices along I-440 in Raleigh, NC from Walnut Street to Lake Boone Trail and along… Continue reading I-440 Design-Build ITS Design | Raleigh, NC
US 74 Signal Timing Exult is partnered with the NCDOT SSTO Section to retime eight signalized intersections along a 2.2 mile stretch of US 74/NC 200 (Roosevelt Blvd) in Monroe, NC. The Exult team worked with the SSTO and Division 10 traffic engineering staff to determine NCDOT’s vehicular priorities for the corridor before developing and… Continue reading US 74 Signal Timing | Monroe, NC
US 321 Signal Timing Exult worked with the NCDOT Signal System and Timing Operations Section (SSTO) section to add coordinated timing plans to four signalized intersections along a 1.4 Mile stretch of US 321 in Blowing Rock, NC. Our project team worked with the SSTO Section and Division 11 traffic engineering staff to determine NCDOT’s… Continue reading US 321 Signal Timing | Blowing Rock, NC