US 74 Signal Timing

Exult is partnered with the NCDOT SSTO Section to retime eight signalized intersections along a 2.2 mile stretch of US 74/NC 200 (Roosevelt Blvd) in Monroe, NC. The Exult team worked with the SSTO and Division 10 traffic engineering staff to determine NCDOT’s vehicular priorities for the corridor before developing and implementing a coordinated timing plan into the traffic signals running OASIS software.


Tasks included in the project: before travel time collection, evaluation and observation of existing timings, synchro model development, and implementation of new timings, after travel time collection, and probe traffic data analysis. Final timings were implemented using the NCDOT Centracs software.