Through the Town of Cary Transportation Engineering On-call, Exult Engineering delivered final plans for the Crabtree Creek Greenway (BL-0036), a LAPP-funded project. This 0.6-mile, 10-foot-wide greenway extends from Bond Park, passes under SW Cary Parkway, and continues through the Prestonwood Soccer Complex to High House Road. Our services included greenway design, drainage and geotechnical design, environmental and FEMA permitting, NEPA documentation, and bid phase support.